The Ministry of Land, Forests and Mining extended the mining license of the Konongo Gold Project by 13 years to 2023 based on the positive feasibility studies and environmental assessments completed by Tagit Consulting. The extension had allowed recommencing operations on the Konongo Gold Project which was lying idle since 1997.
The project involved refurbishment of the existing carbon-in-leach (CIL) plant and revising the mining designs and schedules to re-optimise production and operating margins. It also involved reclamation of the old Konongo tails dam.
Mining at the tails dam of the old Konongo recommenced after the environmental permit was received from the Environmental Protection Agency (EPA) of Ghana in March 2011 and continued even in the third quarter of 2011.
Gold production rates at the Ghanaian mining project
Past production from the project was reported to be 1.6 million ounces (Moz) at a head grade of 11.8 grams per ton (g/t). The expansion aimed to increase the production by 40,000oz to 60,000oz of gold at grades of 2g/t to 3g/t.
The current capacity of the mine is 2,295oz of gold doré. Signature Metals plans to ramp-up the mining operations to 350,000tpa. Proceeds from the sale of initial production will be used for further exploration and expansion of the mine.
Geology and reserves of the Konongo gold mine
Most of the Konongo Gold prospect lies in the Obenemase area of the Ashanti Gold Belt. It consists of Upper Birimian and Tarkwaian rock series folded in the northeast trend. The Upper Birimian limbs are separated by Tarkwaian sediment in the syncline core in the southeast.
Mineralisation occurs in quartz reef style in disseminated sulphide present within the Upper Birimian Volcano-sedimentary rocks.
The Old Konongo tails dam contain indicated and inferred resources of 61,150oz graded at 1.09g/t on an average.
The total resource in the reclaimed project as of June 2010 is 19.6 million tons of gold graded at 2.02g/t for 1.27moz of contained gold.
The old Konongo project was an open pit operation. The expansion operations commenced with the mining of the new and existing open pit operations at the Apan, Asewera, Atansu and Boabedroo deposits located within a radius of 1k to 2.5km of the centre of the project area.
Transport and handling
Konongo Gold Project is accessible via sealed roads from the Tema Port in Accra. It is also in proximity to port facility at Takoradi, which is 300km south of the project area.
Ghana's high transmission electrical line also runs from the project area with a substation situated in the property. All other support business and services are located within 50km of the project area in Kumasi.
Courtesy www.mining-technology.com |