ARUL MURUGAN Borewell is an established borewell contractor based in Chennai city, Tamilnadu, India. Arul Murugan Borewell is run by well experienced people since 1982. Arul Murugan Borewell completed more than twenty five thousands of borewell for domestic, industrial and agriculture requirements in and around Chennai. For all your borewell, plumbing & rain water harvesting needs you can feel free to contact Arul Murugan Borewell

 

Borewell Drilling Contractors & Plumbing Works Undertaken Rain Water Harvesting Scheme Also done Highly Professional Method
Mobile: 98410 46128, 98414 46128

our services
aerow
aerow
aerow
aerow
aerow
 
dthrotarydrilling.com 
foot
 

Services

BOREWELL:

Expertise : We are pioneers in borewells, established in 1982. We are expert in drilling 41/2, 6, 8, 10, 12, 16, 18 dia borewells with super fast hydraulic rigs and experienced borewell drilling operators
  • 26 Years of Experience

  • Specialised in Deep Borewell

  • DTH, Slow-Rig, Rotary

  • 4 1/2 ", 6", 8" 10", 12" 16", 18" Dia Borewells

  • Hiring of all types of Breaker Hammer and Compresser on hourly basis

  • We supply all sizes of Decoration and Borewell Pebbles

  • We also do Soil Testing

  • Rain Water Harvesting Scheme

  • (S.Cutting) Side Bore, Horizontal Holes Cutting 6" to 24" also done

  • Soil Test by Professionals

  • We undertake Geophysical Survey with Guarantee to Customers before putting borewell by Selecting Suitable Methods

  • We do everything in Borewells in Highly Professional Method

  • We also do Pipeline Checking in Apartments, Individual Houses / Bungalows

  • We have pile works and Dewater projects also
borewell borewell   dewatering  

This is an Borewell Company, which undertakes all types of boreworks in all types of soil, it is not only a borework that the company doing according to the particular feet it also has a many features of work as given in the forthcoming paragraphs :-

 SURVEY DESIGNING OF THE BOREWELL

FIRST STEP :-

Before starting the borework in particular area, the company will undertake the entire survey of that particular area, type of sand, ground water source and quality of the water.

Diagrams showing the formation of surface folding.
Diagrams showing the formation of surface folding.

Thin arrows indicate the directions of the movement.

Thick arrows point at the direction of acting forces

SURVEY:-

When the company bore starts the survey work, they scrutinize the type of the sand and the type of the rock, & the water level. Particularly, if saline water comes the company should distinguish the core composed of plastic rocks and the enclosing rocks surrounding it. Besides, we find a marked difference between the structure of the core and the enclosing rocks. The core bears all the features of the active dislocation of the plastic masses composing it in the upward direction, while the structure of the enclosing rocks reflects only their passive accommodation to the movement of the core. The contours of the core are characterized by a gentle arch and steep lateral surfaces. In the plan the contours of the core are not the same at different depths. In this respect the Romna dome in the Ukraine presents no minor interest. The core of the fold, composed of the Devonian rock salt, in the Upper Cretaceous deposits is elongated in the north - west direction parallel to the strike of the Hercynian structures; in Paleogene deposits the core acquire the rounded contours.

The inner structure of the core is characterized by an exceptionally complicated arrangement. The plastic rocks composing the core are crumpled into narrow and compressed folds. Which can be formed only when the substances is in the state of flowing. Individual inter-layers composing these folds are greatly extended; in place however, they form complex bendings, clusters, and irregular bulges.

They enclosing rock masses at the contact with the core are often fractured and truncated by the plastic rocks of the core. In the proximity of the contact they have a steep form of bedding, often turned upside down or overturned. Numerous ruptures and gliding surfaces are developed within them along which individual members and riders become separated from the rocks that enclose them and follow the core in their dislocation over considerable distances. The said displacement is accompanied by the development of zones of fracture and fault breccias, which attribute to the structure of enclosing rocks in the contact zone complexity of a very high degree. These dislocations soon die out as the core becomes more remote - and at a distance of several hundred meters from the dislocated zone, they usually disappear altogether. Thus, in diaper structures two types of folds coexist : in the active core there is the development of the flow folds, whereas the rocks surrounding the core and subjected to transverse bending.

Above all, the company finds out not only the type of the water, and also the type of the rock and depth of ground water.

Bauman net for the establishing of the true elements of bedding
Bauman net for the establishing of the true elements of bedding
by the two apparent types of slope

PART 2:- FORMS OF ROCK BEDDING:-

It is by far not always possible to measure the elements of the bedding of layers with the help of the surveyor's and diviners report alone. When the cores of boreholes and the walls of mining works are investigated, the measurement of the elements of bedding and water source becomes very often either totally impossible or can be accomplished only approximately.

SKETCH OF THE BOREWELL (or) DESIGNING OF THE BOREWELL:-

After the soil test, the company starts the bore work according to the bore type. In this, they are inserting the slotter, only if the company is satisfied with the quality of the water, quantity of the water & the water level. The company is using the pebbles to filter the water from the fine sand also when required. To avoid the soil erosion we use powerful bentonite powder.

Only this structure helps us to get success in our bore well work and also to get good and more water in all our sites. In rainy season, in Chennai we can get water least in 20 to 30 feet itself where as on summer season we could not get water even in 120 feet, so the company doing bore well work according to the seasons & getting permanent solution for water problem in all over Tamilnadu.

In general, after the bore well work no one takes care of the bore till date. i.e., none of the bore well company takes care of the bore well point which leads to dissolving the bore point in future. where as our company using top safe cup which avoids small insects to get inside the borewell. Also there is a possibility of particles coming inside through the rainwater harvesting, also which leads to get destroy of the bore water. To face this problem, our company taking all the necessary steps and advising the parties to get rid of this type of problem in all the times.

Moreover, borewell also get destroyed by the food particles near the borewell, & the dirty water comes inside the bore through the toilet pipes and drainage pipes in rainy seasons. In this situations, our company advising the pros & consequences to all our parties.

3rd Level :-

There are some areas which must undergone re-flushing after six month's time. Particularly in sandy area when we insert the PVC pipe the holes of the slotter will be in 0.5mm to 1.5mm only. In rainy seasons, small sand particles might cover the slotter holes even after taking necessary steps like pebbles packing near the bore, which might leads to the low water level, and also the destroy the condition of motor and the pump set. In this case, our company is giving free service for 6 months to one year and also undertakes short term and long term before protection.
 
Send mail
 
 
  Home | About us | Subscribe | Advertise in Magazine | Board | Technical Papers | Interview | E-Paper | Editor's Desk | Media Kit | Directory | Contact Us | Site Map  
 
Terms & Conditions - Disclaimer Copyright © 2009 dthrotarydrilling.com All rights reserved.